It shut down in mid-May. That is the cost incremental to the normal cost of the operations of the site that will be required to repair the NRU.
On October 19th, 2009. See this statement in context.
On October 19th, 2009. See this statement in context.
October 19th, 2009 / 5:30 p.m.
Senior Vice-President and Chief Nuclear Officer, Atomic Energy of Canada Limited
It shut down in mid-May. That is the cost incremental to the normal cost of the operations of the site that will be required to repair the NRU.